In 2017 JSC “Tatavtodor” had finished construction, reconstruction and maintenance of 182 sites on public auto roads in the Republic of Tatarstan worth 5.2 billion RUB. Total length of the roads constructed and reconstructed is 373 km, 87.6 km of them are municipal auto roads, including roads built as parts of the following programs: Works for implementation of municipal programs of road works on the public local roads for 2017 in the Republic of Tatarstan;
Works worth 107.5 million roubles, total road length – 11 km, works conducted in 5 municipal districts of the Republic of Tatarstan.
Reconstruction of the asphalted road network in district centers and cities of the republic of Tatarstan;
Works worth 445.5 million roubles, total road length – 47,9 km, works conducted in 21 municipal districts of the Republic of Tatarstan.
Normalization of the road network (intermediate type of coating) in inhabited localities of the Republic of Tatarstan;
In 2017 the works on site “Reconstruction of the auto road Chistopol-Nizhnekamsk, part km 24 – km 26 with a bridge across Tolkishka river in Chistopolsky district of the Republic of Tatarstan” have been finished successfully. For the reporting period, access roads with solid surface were constructed in 24 inhabited localities of the republic with population of more than 4 thousand people. The works were conducted at 22 sites of total length of 100 km in 12 municipal districts of the republic, including 4 sites with intermediate type of surfacing 22.2 km long. During 2017 JSC “Tatatvtodor” also took active part in “Sustainable development of rural territories in 2014-2017 and until 2010” federal program (see table below):
Last year JSC “Tatavtodor” took part in the state program “Complex development of transport infrastructure of urban agglomeration”. The works were conducted on 13 sites of Kazan agglomeration of total length 26.9 km and 7 sites of Naberezhnye Chelny agglomeration of total length 15.2 km; total worth of works amounted to 488.3 million roubles.
|