May - October 202211/18/2022 Аrsky Branch Bolshaya Atnya – Tashkichu: 0+870 - 4+828 (Atninsky district of the Republic of Tatarstan)
Works are finished on site. 10/31/2022 Aksubaevsky Branch Alekseyevskoye – Almetyevsk: 51+500 – 61+400 (Aksubayevsky district of the Republic of Tatarstan)
Construction of road surface in accordance with works planned for 2022 is finished on construction site km 51+500 - km 61+400. 10/31/2022 Menzelinsky Branch
Menzelinsk – Russkiy Karan – Togashevo: 20+085 - 25+485 (Menzelinsky district) 10/31/2022 Menzelinsky Branch “Menzelinsk – Russkiy Karan – Togashevo” – Karan - Azikovo: 0+000 - 1+300 (Menzelinsky district)
Construction works are finished. 10/31/2022 Menzelinsky Branch Aktanysh – Musliumovo: 24+400 - 28+440 (Aktanyshsky district)
Construction works are finished. Total length of the constructed part is 4.040 km. 10/31/2022 Menzelinsky Branch Staroye Alimovo - Chishma: 0+000 - 4+849 (Aktanyshsky district)
Construction works are finished. Total length of the constructed part is 4.849 km. 10/29/2022 Аrsky Branch Access road to Arsk city from the south: 0+000 - 2+907; 2+907 - 4+535 (Arsky district) 10/29/2022 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 12+500 – 16+300 (Arsky district)
Construction works on site are finished. 10/19/2022 Аrsky Branch Koshar – Kliuchi-Sap: 10+444 - 11+524; 6+185 - 7+185 (Atninsky district)
Construction works on site are finished. 10/18/2022 Apastovsky Branch “Kazan – Ulyanovsk” – Kamskoye Ustye: 31+598 - 38+000 (Kamsko-Ustyinsky district)
Construction works on site are finished. 10/17/2022 Menzelinsky Branch Local auto roads maintenance in Musliumovsky district of the Republic of Tatarstan (Musliumovsky district). 10/11/2022 Buinsky Branch Russkiye Kishaki – Koshki – Novoye Timbayevo: 0+000 - 3+874 (Buinsky district) Workers of our company conduct stabilization of soil with lime and construction of bottom road course using A32Hн asphalt-concrete mix. 10/11/2022 Suburban Branch Kazan – Shemordan: 38+695 - 43+244 (Pestrechinsky district)
On photos:
Construction of sandy subsoil,
Construction of binder course (macadam-and-sand mix, grade C-4),
Construction of base course (coarse-grained asphalt-concrete mix M-2),
Construction of sub-base (coarse-grained asphalt-concrete mix M-1, type A),
Construction of surface course (stone mastics asphalt, grade 20). 10/10/2022 Apastovsky Branch Krasnovidovo - Siukeyevo: 3+840 - 9+000 (Kamsko-Ustyinsky district)
Vertical road marking on the driveway is complete. 10/10/2022 Аrsky Branch Bolshaya Atnya - Chepchugy (Atninsky district) Works are finished. 10/10/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 79+457 - 80+073 (Aksubayevsky district)
Works are finished. 10/10/2022 Aksubaevsky Branch “Chistopol – Aksubayevo – Nurlat” – Nizhnyaya Tatarskaya Mayna (Aksubayevsky district)
Works are finished. 10/10/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 66+666 - 68+325 (Aksubayevsky district)
Works are finished. 10/07/2022 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 12+500 - 16+300 (Arsky district)
Construction of asphaltic surface course (macadam-and-mastics grade 8). 09/30/2022 Suburban Branch Kurkachi – Verkhnyaya Iya: 0+000 - 3+000 (Vysokogorsky district)
Construction of surface course of stone mastic (grade 8). 09/28/2022 Suburban Branch Stolbistche – Atabayevo: 1+000 - 1+300 (Laishevsky district) Construction of surface course of stone mastic (grade 16). Strengthening of roadsides using sand-and-gravel mix (fraction 4). 09/22/2022 Apastovsky Branch Works conducted in accordance with Municipal road construction program for 2022 in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district) Workers of our company continue works on site. 09/21/2022 Аrsky Branch Bolshaya Atnya – Tashkichu: 0+870 - 4+828 (Atninsky district)
Construction of road base course of 7 cm thick А32Нн asphalt-concrete mix. 09/21/2022 Apastovsky Branch Road network (Apastovsky district)
Construction of road surface using sand-and gravel mix (fraction 4, grade M800) is finished. 09/19/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 79+457 - 80+073 (Aksubayevsky district)
Workers of JSC “Tatavtodor” conduct construction of surface course of RAU-8. 09/19/2022 Menzelinsky Branch Aktanysh – Musliumovo: 73+683 - 78+380 (Musliumovsky district)
Works on site are finished. 09/19/2022
Staroye Saitovo – Sikiya – Ulimanovo: 0+000 - 5+250 (Aktanyshsky district)
Works on site are being finished. 09/19/2022 Menzelinsky Branch "Menzelinsk – Biurgan" – Guliukovo (Menzelinsky district)
Works on site are finished. 09/17/2022 Apastovsky Branch Access road to Shelanga settlement: 5+190 - 5+415; 5+685 - 5+910 (Verkhneuslonsky district)
Works on site are finished. 09/12/2022 Аrsky Branch Koshkar – Kliuchi – Sap: 10+444 - 11+524; 6+185 - 7+185 (Atninsky district)
Construction of surface course of 10 cm thick stone mastic asphalt. 09/08/2022 Аrsky Branch Bolshaya Atnya – Tashkichu: 0+870 - 4+828 (Atninsky district)
Construction of road base course using cold recycling method. In the process, we add 50% of M-800 macadam (fraction 16-63.5 mm) to the recycler-mixer for better result. 09/08/2022 Аrsky Branch
Access road to Arsk city, south: 0+000 - 2+907; 2+907 - 4+535 (Arsky district) 09/07/2022 Apastovsky Branch Tetiushi – Kamskoye Ustye: 27+549 - 27+999 (Kamsko-Ustyinsky district) Construction of asphalted surface is finished. 09/07/2022 Apastovsky Branch "Kazan - Ulyanovsk" – Staroye Baryshevo – Kamskoye Ustye: 1+870 - 2+335 (Apastovsky district)
Construction of leveling course with А16Нн asphalt-concrete mix is finished. 09/07/2022 Apastovsky Branch Works planned and funded in 2022 for Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)
Strengthening of roadsides with macadam is finished. 09/05/2022 Apastovsky Branch Kazan - Ulyanovsk – Tatarskoye Burnashevo (Verkhneuslonsky district)
Works are finished. 09/05/2022 Mamadyshsky Branch
"Volga" – Kamsky Lespromkhoz - Bersut: 0+000 - 3+500 (Mamadyshsky district)
Construction of macadam-and-mastics asphaltic surface course (grade 8).
Strengthening of roadsides with M400 macadam.
09/02/2022 Suburban Branch Stolbistche – Atabayevo: 27+080 - 27+920 (Laishevsky district)
Workers conduct construction of leveling course of А16Нн asphalt-concrete mix and asphaltic surface course of macadam-and-mastics (grade 8). 09/02/2022 Suburban Branch М-7 "Volga" – Kutlu Bukash – Rybnaya Sloboda: 41+050 - 41+600 (Rybno-Slobodsky district)
Cold milling of old asphaltic surface. Construction of macadam-and-mastics asphaltic surface course (grade 8). 09/01/2022 Apastovsky Branch Works planned and funded in 2022 for Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)
Workers continue construction on site. 09/01/2022 Apastovsky Branch Krasnovidovo - Siukeyevo: 3+840 - 9+000 (Kamsko-Ustyinsky district)
Construction of road surface course with А32Нн asphalt-concrete mix (thickness 7 cm). 08/31/2022 Buinsky Branch Staroye Drozhzhanoye – Tatarskiye Shatrashany – Chuvashskaya Bezdna: 0+000 - 5+341 (Drozhzhanovsky district)
Strengthening of roadsides with M400 macadam. 08/31/2022 Suburban Branch Kurkachi – Verkhnyaya Iya: 0+000 - 3+000 (Vysokogorsky district)
Construction of sand-and gravel mix road bed.
Construction of base course with А32Нн asphalt-concrete mix. 08/26/2022 Nizhnekamsky Branch Khimikov Ave., between Korabelnaya Str. and Yuzhnaya Str.: 0+000 - 1+577 (Nizhnekamsky district)
Workers conduct construction of road surface course with macadam-and-mastics asphalt (grade 8). 08/26/2022 Sabinsky Branch Kildebyak – Staraya Ikshurma (Sabinsky branch)
Construction of asphaltic surface course with macadam-and-mastics (grade 8, thickness 4 cm). 08/26/2022 Apastovsky Branch Kazan - Ulyanovsk – Tatarskoye Burnashevo (Verkhneuslonsky district)
Construction of road surface course with macadam-and-mastics asphalt (grade 10). 08/24/2022 Suburban Branch Laishevo - Chirpy: 8+225 - 11+275 (Laishevsky district)
Cold regeneration of worn-out road surface with addition of M-800 macadam (fraction 16-63.5 mm) and Portland cement. Construction of base course with А32Нн asphalt-concrete mix. 08/24/2022 Nizhnekamsky Branch Korabelnaya Str. (between Khimikov-Korabelnaya crossing and Korabelnaya Str. 52): 0+000 - 1+195 (Nizhnekamsky district))
Construction of road surface course with macadam-and-mastics asphalt (grade 8). 08/22/2022 Apastovsky Branch Ulanovo – Karatun: 17+412 - 20+600 (Kaibitsky district)
Construction of road surface course with polymer mastics asphalt (grade 8). 08/22/2022 Aksubaevsky Branch "Chistopol – Aksubayevo – Nurlat" – Nizhnyaya Tatarskaya Mayna (Aksubayevsky district)
Road surface construction. 08/15/2022 Aksubaevsky Branch Aksubayevo - Fedorovka: 9+385 - 9+950 (Aksubayevsky district)
Workers are finishing works on site. 08/10/2022 Аrsky Branch Access road to Arsk city, south: 0+000 - 2+907; 2+907 - 4+535 (Arsky district)
Road slopes construction. 08/09/2022 Аrsky Branch Kazan – Shemordan: 74+139 - 78+700 (Tiulyachinsky district) Construction is finished. 08/08/2022 Menzelinsky Branch Staroye Saitovo – Sikiya – Ulimanovo: 0+000 - 5+250 (Aktanyshsky district) Construction of 5.25 km long asphalt-concrete surface layer is finished. 08/08/2022 Menzelinsky Branch Aktanysh – Musliumovo: 73+683 - 78+380 (Musliumovsky district) Construction of 4.697 km long asphalt-concrete surface layer is finished. 08/08/2022 Menzelinsky Branch Aktanysh – Musliumovo: 24+400 - 28+440 (Aktanyshsky district)
Workers of the company conduct reconstruction works. 08/05/2022 Buinsky Branch Buinsk – Tetiushy: 0+000 - 5+200 (Buinsky district)
Construction of surface course (macadam-and-mastics asphalt grade 10, 4 cm thick), installation of new sections of metal barriers, strengthening of roadside slopes with M-600 macadam. 08/05/2022 Buinsky Branch "Staroye Drozhzhanoye – Tatarskiye Shatrashany” – Gorodistche (Drozhzhanovsky district)
Construction of 20 cm thick sandy subgrade and 25 cm thick base course of С4 М800 macadam-and-sand mix. 08/04/2022 Аrsky Branch Access road to Arsk city from the south: 0+000 - 2+907; 2+907 - 4+535 (Arsky district)
Construction of asphalted bottom course with А32Нн mix. 08/04/2022 Suburban Branch Stolbistche - Atabayevo: 1+000 - 1+300 (Laishevsky district)
Construction of base course with А32ОТ asphalt-concrete mix. 08/04/2022 Menzelinsky Branch Road maintenance works on local roads in Aktanyshsky district of the Republic of Tatarstan
Summer road maintenance. 08/03/2022 Mamadyshsky Branch М-7 "Volga" - Sekines, part Ragozino – Omarskiy Pochinok: 0+000 - 3+085 (Mamadyshsky district)
Construction of asphalted bottom course with А32Нн mix. 08/01/2022 Mamadyshsky Branch М-7 "Volga"-Kamsky Lespromkhoz – Bersut: 0+000 - 3+500 (Mamadyshsky district)
Construction of asphalted levelling course with А16НН mix. 08/01/2022 Mamadyshsky Branch Road maintenance works on local roads in Mamadyshsky district of the Republic of Tatarstan
Workers of JSC “Tatavtodor” mow the grass off the roadsides and slopes on M7 “Volga” – Sekines auto road using tractor-mounted mower. 08/01/2022 Mamadyshsky Branch М-7 Volga (Federal auto roads)
Sanitation of cracks in asphalt-concrete surface using bituminous mastics, reinstallation of new sections of metal barriers where necessary. 07/31/2022 Suburban Branch Kurkachi – Verkhnyaya Iya: 0+000 - 3+000 (Vysokogorsky district)
Cold regeneration of road surface (1st pass). Workers remove topsoil from the slopes and embankment sole.
07/30/2022 Suburban Branch М-7 "Volga" – Estachi: 0+000 - 4+000 (Vysokogorsky district)
Construction of sandy subgrade and macadam-and-sand С-4 base course. 07/30/2022 Mamadyshsky Branch М-7 "Volga" - Sekines, part Ragozino – Omarskiy Pochinok: 0+000 - 3+085 (Mamadyshsky district)
Construction of supplemental bottom course using enriched sand-gravel mix strengthened with cement. 07/30/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye: 12+500 - 13+810 (Kamsko-Ustyinsky district) Construction is finished.
07/29/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye: 0+650 - 1+870 (Apastovsky district) Construction is finished. 07/29/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 48+480 - 50+480 (Aksubayevsky district)
Construction is finished. 07/27/2022 Аrsky Branch Kazan – Shemordan: 81+700 - 82+000 (Tiulyachinsky district)
Construction is finished. 07/27/2022 Аrsky Branch Access road to Arsk city (south): 0+000 - 2+907; 2+907 - 4+535 (Arsky district) Construction of levelling course using porous fine-grained asphaltic M-2 mix. 07/25/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye: 0+650 - 1+870 (Apastovsky district)
Workers of JSC “Tatavtodor” conduct strengthening of roadsides with macadam. 07/23/2022 Menzelinsky Branch Musliumovo – Tatarskiy Shugan (Musliumovsky district)
Construction of asphalt-concrete base course is finished. 07/23/2022 Menzelinsky Branch "Menzelinsk – Biurgan" – Guliukovo (Menzelinsky district)
Construction of 6.3 km of asphalted surface layer is finished. The surface course of main road (4.67 km long) is made of stone mastics asphalt, grade 10. Access road to Urusovo locality is 1.63 km and is now covered with stone mastics surface course (grade 5). 07/21/2022 Suburban Branch Stolbistche – Atabayevo: 1+000 - 1+300 (Laishevsky district)
- Construction of sandy bottom course.
- Construction of sand-and-macadam subgrade. 07/20/2022 Аrsky Branch Bolshaya Atnya – Chepchugy (Atninsky district)
Construction of carpet coat (stone mastics grade 10). 07/20/2022 Nizhnekamsky Branch Chistopol - Nizhnekamsk: 61+173 - 65+656 (Nizhnekamsky district) Construction of carpet coat (stone mastics grade 16). 07/20/2022 Buinsky Branch Buinsk – Tetiushy: 0+000 - 5+200 (Buinsky district)
Strengthening works at sag pipe. 07/20/2022 Buinsky Branch "Staroye Drozhzhanoye – Tatarskiye Shatrashany" - Gorodistche (Drozhzhanovsky district)
Stabilization of soil with lime. 07/20/2022 Apastovsky Branch Road network (Kamsko-Ustyinsky district)
Construction of subgrade and surface road course. 07/20/2022 Apastovsky Branch Kazan – Ulyanovsk – Tatarskoye Burnashevo (Verkhneuslonsky district)
Construction of road surface course using porous fine-grained asphaltic M-2 mix, 7 cm thick. 07/19/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Kamskoye Ustye: 31+598 - 38+000 (Kamsko-Ustyinsky district)
Construction of road surface course using А32Нт asphalt-concrete mix, 7 cm thick. 07/19/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye: 0+650 - 1+870 (Apastovsky district)
Construction of road surface course using SP–8 asphalt-concrete mix. 07/19/2022 Apastovsky Branch Kazan – Ulyanovsk – Tatarskoye Burnashevo (Verkhneuslonsky district) Construction of sandy subgrade, geogrid laying and construction of bottom course (macadam M-800, grade 16-63 mm). 07/18/2022 Аrsky Branch М-7 "Volga" - Shadki - Saush - Sharmashy: 0+000 - 5+185 (Tiulyachinsky district)
Stabilization and strengthening of soil with non-organic binder using regenerator-mixer. 07/18/2022 Аrsky Branch Access road to Arsk city (south): 0+000 - 2+907; 2+907 - 4+535 (Arsky district)
Milling of asphalted surface course.
Construction of bottom course with regenerator-mixer using cold recycling method. 07/18/2022 Apastovsky Branch Road maintenance on local roads in Verkhneuslonsky district
Summer road maintenance works. 07/18/2022 Apastovsky Branch Р-241 Kazan – Ulyanovsk (Federal auto roads) Summer road maintenance works. 07/18/2022 Nizhnekamsky Branch Khimikov Avenue (Between Mendeleyev Street and Vakhitov Avenue): 0+000 - 0+510 (Nizhnekamsky district)
Construction of road surface course using ЩМА–8 asphalt-concrete mix. 07/14/2022 Apastovsky Branch "Kazan – Ulyanovsk” – Kamskoye Ustye: 31+598 - 38+000 (Kamsko-Ustyinsky district)
Road blading with addition of sand and macadam (С4 М-800) using auto grader and moving the grass back to slopes with bulldozer. 07/13/2022 Suburban Branch М-7 "Volga" - Estachy: 0+000 - 4+000 (Vysokogorsky district)
Ground works on site. 07/12/2022 Menzelinsky Branch Tiukovo – Tatarskiye Yamaly (Aktanyshsky district)
Reconstruction of the road is finished. 07/12/2022 Menzelinsky Branch Musliumovo – Tatarskiy Shugan (Musliumovsky district)
Construction of road surface using sand-and-gravel mix strengthened with cement. 07/12/2022 Menzelinsky Branch Almetyevsk - Musliumovo: 53+700 - 55+500 (Musliumovsky district)
Reconstruction of the road is finished. 07/12/2022 Menzelinsky Branch Aktanysh - Musliumovo – Kirov state farm: 2+500 - 4+580 (Aktanyshsky district)
Reconstruction of the road is finished. 07/11/2022 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 12+500 - 16+300 (Arsky district) Construction of bottom course of asphalt-concrete surface. 07/05/2022 Apastovsky Branch Ulanovo – Karatun – Bolshiye Kaybitsy (Kaibitsky district)
Construction of bottom course using А32Нн asphalt-concrete mix. 07/01/2022 Suburban Branch Stolbistche - Atabayevo: 1+000 - 1+300 (Laishevsky district)
Milling of asphaltic surface and construction of earthen bedding course. 06/28/2022 Menzelinsky Branch Tiukovo - Tatarskiye Yamaly (Aktanyshsky district) Construction of surface course (macadam-and-mastics grade 8, total length 2.431 km). 06/27/2022 Аrsky Branch Ashitbash - Shushmabash - Karaduvan: 12+500 - 16+300 (Arsky district) Construction of base course using cold recycling method (stabilization with cement). 06/24/2022 Suburban Branch Road maintenance works on regional auto roads in Rybno-Slobodsky district of the Republic of Tatarstan. 06/24/2022 Apastovsky Branch Kazan - Ulyanovsk - Tatarskoye Burnashevo (Verkhneuslonsky district)
Workers of JSC Tatavtodor conduct regeneration of road surface and construction of asphalt-concrete road surface. 06/23/2022 Apastovsky Branch Verkhniy Uslon - Pechischi: 0+000 - 0+610 (Verkhneuslonsky district)
Construction of macadam-and-mastics surface course (grade 8). 06/20/2022 Buinsky Branch Staroye Drozhzhanoye - Tatarskiye Shatrashany - Chuvashskaya Bezdna 0+000 - 5+341 (Drozhzhanovsky district)
Construction of macadam-and-mastics surface course (grade 10, thickness 4 cm). 06/17/2022 Mamadyshsky Branch М-7 "Volga" - Sekines, part Ragozino - Omarsky Pochinok: 0+000 - 3+085 (Mamadyshsky district)
Our workers conduct construction works. 06/17/2022 Mamadyshsky Branch М-7 "Volga" - Kamsky Logging company - Bersut: 0+000 - 3+500 (Mamadyshsky district)
Our workers conduct construction works. 06/17/2022 Mamadyshsky Branch М-7 "Volga" (Federal auto roads) Summer road maintenance works. 06/15/2022 Аrsky Branch Kazan - Shemordan: 81+700 - 82+000 (Tiulyachinsky district)
Construction of the surface course with macadam-and-mastics asphalt, grade 16. 06/14/2022 Аrsky Branch Kazan - Shemordan: 81+700 - 82+000 (Tiulyachinsky district)
Construction of leveling the surface course. 06/09/2022 Suburban Branch Р-239 Kazan - Orenburg - Akbulak - Kazakhstan Republic limits: 13+700 - 20+230 (Laishevsky district)
Construction of wearing course of macadam-and-mastics asphalt, grade 11, thickness 4 cm. 06/07/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat (Aksubayevsky district) Construction of surface course. 06/04/2022 Menzelinsky Branch Almetyevsk – Musliumovo: 53+700 - 55+500 (Musliumovsky district) Construction of leveling course of porous finely grained А16Нн asphalt-concrete and surface course of 4 cm thick macadam-and-mastics asphalt-concrete (grade 8) on a 1.8 km long site is finished. 06/04/2022 Menzelinsky Branch Menzelinsk – Russkiy Karan- Togashevo: 20+085 - 25+485 (Menzelinsky district) Construction of pavement layers. 06/03/2022 Buinsky Branch "Staroye Drozhzhanoye – Tatarskiye Shatrashany” - Gorodische (Drozhzhanovsky district)
Dismantling of asphaltic surface with regenerator-mixer. 06/02/2022 Sabinsky Branch Kazan - Shemordan: 86+600 - 88+600 (Sabinsky district)
Strengthening of roadsides with macadam-and-sand mix (С-4 М-800, thickness 10 cm). 06/02/2022 Menzelinsky Branch Aktanysh – Musliumovo – Kirov Farm: 2+500 - 4+580 (Aktanyshsky district) Construction of leveling course of porous finely grained А16Нн asphalt-concrete and surface course of 4 cm thick macadam-and-mastics asphalt-concrete (grade 8) on a 2.08 km long site is finished. 05/31/2022 Suburban Branch Р-239 auto road Kazan –Orenburg – Akbulak – Kazakhstan Republic limits: 13+700 - 20+230 (Laishevsky district)
Cold milling of asphalt-concrete surface. 05/31/2022 Аrsky Branch Kazan - Shemordan: 74+139 - 78+700 (Tiulyachinsky district)
Construction of surface course with macadam-and-mastics asphalt, grade 8. 05/31/2022 Suburban Branch Kazan – Shemordan: 23+674 - 25+224 (Pestrechinsky district)
Construction of surface course of macadam-and-mastics asphalt (grade 8) and SMA-11. 05/31/2022 Suburban Branch “Kazan - Orenburg" – Rybnaya Sloboda - Kornoukhovo (Rybno-Slobodsky district)
Construction of 20 cm thick auto road base course using cold regeneration method with addition of water, enriched sand and gravel mix and 4% of portland cement. 05/30/2022 Аrsky Branch Kazan - Shemordan: 74+139 - 78+700 (Tiulyachinsky district)
Construction of leveling course. 05/28/2022 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 48+480 - 50+480 (Aksubayevsky district)
Workers of JSC “Tatavtodor” conduct construction of leveling course. 05/27/2022 Sabinsky Branch Satyshevo – Bolshiye Kibyachi (Sabinsky district)
Construction of macadam-and-mastics (grade 10) asphalted surface course. 05/26/2022 Nizhnekamsky Branch Naberezhnye Chelny – Zainsk – Almetyevsk: 5+208 - 8+800 (left side) (Tukayevsky district)
Construction of macadam-and-mastics (grade 16) base course. 05/20/2022 Apastovsky Branch “Kazan - Ulyanovsk" – Staroye Baryshevo – Kamskoye Ustye: 12+500 - 13+810 (Kamsko-Ustyinsky district)
Construction of leveling course. 05/20/2022 Sabinsky Branch May 20, 2022 Kazan - Shemordan: 86+600 - 88+600 (Sabinsky district)
Construction of 4 cm thick macadam-and-mastics (grade 8) asphalted surface course. 05/18/2022 Buinsky Branch
"Buinsk - Yalchiki " – Bik-Uteyevo (Buinsky district) 05/17/2022 Buinsky Branch Local roads maintenance in Tetiushsky district of the Republic of Tatarstan. 05/16/2022 Suburban Branch Kazan – Shemordan: 23+674 - 25+224 (Pestrechinsky district)
Cold milling of asphalted surface.
Construction of levelling course with black macadam and A16HT asphalt-concrete mix. 05/16/2022 Suburban Branch Р-239 Kazan – Orenburg (Federal auto roads)
Mowing the grass with tractor mower. 05/16/2022 Buinsky Branch Road maintenance works on regional roads in Buinsky municipal district of the Republic of Tatarstan. 05/11/2022 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 12+500 - 16+300 (Arsky district)
Road dismantling with CATERPILLAR RM500B recycler. 05/10/2022 Аrsky Branch Kazan – Shemordan: 74+139 - 78+700 (Tiulyachinsky district)
Milling of asphalt-concrete surface. 05/07/2022 Nizhnekamsky Naberezhnye Chelny – Zayinsk – Almetyevsk: 5+208 - 8+800 (left lane) (Tukayevsky district)
Milling of asphalt-concrete surface. 05/07/2022 Nizhnekamsky Khimikov Ave., between Korabelnaya and Yuzhnaya Str.: 0+000 - 1+577 (Nizhnekamsky district)
Construction of subgrade course with A32HT asphalt-concrete mix. |